Description
Product Introduction
客户要自己准备的事项: |
Parts and equipment to be supplied and installed by the customer :- |
1. Installation of floor guiding rail system for lateral movement |
2. Power supply connection from plant power supply to the equipment |
3. Power supply stabilizer |
4. Transformer(s) for the whole equipment, 400V/50-60Hz/3-phases |
5. Compressed air supply: 6bar, 200 l/min |
6. Crane service or 2 folk lift |
**Important Information:
1) Training: 7 days will be provided upon installation.
2) One year warranty against manufacturing defects but not including consumable parts and caused by inappropriate use by
user.
3) West Malaysia shipping fee included.
4) Including crane service.